Angle grinder throwing sparks while dressing a steel sectionStock
Reference image / surface preparation
Home / Services / Sandblasting

Light industrial sandblasting

Surface preparation ahead of coating or repair, so what goes on the metal actually stays on the metal.

Work
Light industrial blasting
For
Coating and repair prep
Where
In shop
Hours
Open 24 hours
Steel dump body prepared for finishing in the Pro-Line shop
Dump body / in shop, Piketon

Light industrial sandblasting is surface preparation, and it exists because coatings and welds both fail on dirty metal long before they fail on their own.

Paint does not fail because the paint was bad nearly as often as it fails because it was put onto rust, scale or oil. The same is true of a repair weld laid over a surface nobody cleaned. Preparation is not the interesting part of the job and it is usually the part that decides how long the result lasts.

We blast in the shop as preparation ahead of coating or repair, on parts we are already fabricating and on parts brought in for prep. It is light industrial work, which is an honest description rather than a modest one. Tell us the part and what is going onto it afterwards and we will tell you plainly whether this is the right shop for it.

Most often this runs as a step inside a larger job: a truck body being rebuilt, a frame being repaired, a fabricated assembly that has to be coated before it goes into service.

When you send this over, tell us the part, its rough size, what is currently on it, and what is going onto it afterwards. Old paint, mill scale, surface rust and heavy corrosion are four different problems and they do not all get the same answer.

If the honest answer is that your part needs a larger or more specialized blasting operation than this one, we will say so. Taking a job we are not set up for wastes your time twice, once when it is here and again when it has to be done properly somewhere else.

What the surface is starting from
ConditionWhat it meansEffect on preparation
Mill scaleThe dark oxide layer from hot rollingMust come off. Coating over it fails in sheets.
Surface rustLight oxidation, no section lossStraightforward to remove
Heavy corrosionPitting and possible section lossLonger preparation, and the part may need assessment first
Old coatingExisting paint or powderRemoved so the new system keys to metal
Oil or greaseContamination from serviceDegreased before blasting, or it just spreads

How blasting and prep runs

The same sequence every time, so you know what you are buying.

Prep before coating

Scale, rust and old finish removed so the coating has clean metal to hold.

Prep before repair

A clean surface before a repair weld, rather than welding through contamination.

Part of a larger job

Usually one step inside a fabrication or truck body job already in the shop.

Honest scoping

If a part is beyond light industrial blasting we will say so rather than take it and disappoint you.

Trailer stripped back to the frame inside the Pro-Line shop
Stripped to frame / in shop, Piketon

Coatings fail on dirty metal, not on their own.

Preparation is the least visible step and the one that decides how long the finish lasts.

Questions about blasting and prep

Ground and blended weld at a tube-to-tube joint on a steel frame in the Pro-Line shop
What does light industrial mean here?

It means the blasting is scaled to job shop work and to prep inside our own fabrication jobs. Describe your part and we will tell you honestly whether it suits this shop.

Do you coat and paint as well?

Blasting here is surface preparation. Tell us what is going onto the part afterwards and we will scope the prep to suit it.

Can you blast a part we bring in?

Yes, prep-only work is fine. Send the part details on the job form.

Is this available for residential items?

No. Outside of handrails, gates and fences, the work we take is commercial and industrial.

What to send about the surface

Everything you leave out becomes an assumption, and assumptions are what make an invoice differ from a quote. None of this has to be formal.

The part, its rough size and what is on it now

Old paint, scale, rust and grease are four different problems.

What is going onto it afterwards

The coating system decides how the surface needs to be left.

What needs made, modified or repaired

A sentence is enough to start. Precision comes later.

Where the work is

At your facility, or can it come to the shop.

When it has to be done

Including any shutdown or outage window, and whether the date is fixed.

A photograph

For anything that already exists, a photo does more than several paragraphs.

Send us the job

Send us a part to blast

Tell us the part, the current finish, and what is going on the metal afterwards. Size and quantity set the price here.

Commercial, industrial and fleet work, plus awnings, handrails, gates and fences for anyone. We do not take farm work or home improvement jobs.